Archives

Monthly Archive for: ‘September, 2016’

Dining Hall Renovations Underway

The existing Dining Hall was built in 1961 and is in need of renovations to bring it up to current codes as well as to bring it in line with the expectations of our clientele. In order to adequately renovate the building it needs to be set on a solid foundation. When built in 1961 it was placed on concrete …

Read More

Camp Changes Lives

Keith had an amazing time … broken wrist included.  He’s healing nicely by the way.  I wanted to tell you of a change we see in Keith since he came home.  It has been dramatic. In Keith’s words before camp he was “on God’s team” meaning he was a child of God.  However, something more has happened at camp.  Something …

Read More